Commercial and Retail Fire Exit Doors Installation London

Commercial and Retail Fire Exit Doors Installation London

Installing Commercial and Retail Fire Exit Doors

Installing commercial and retail fire exit doors in London is a specialised process that combines compliance with stringent UK building regulations, a deep understanding of the London Fire Brigade's specific requirements, and the unique challenges presented by the city's diverse architecture. These doors are a critical part of a building's fire safety strategy, and their correct installation is paramount to ensuring the safety of occupants.

London’s mix of historic buildings, modern high-rises, and densely packed commercial areas presents unique challenges for fire exit door installation. The doors must not only meet national standards but also be suitable for the specific structural and aesthetic requirements of the building. For example, a fire exit door in a Grade I listed building in Covent Garden will require a different approach to one being installed in a new skyscraper in Canary Wharf. The installation process must be meticulous, ensuring that the door provides both a reliable escape route and an adequate level of security from external threats, a significant concern in a major metropolitan area.

Key Stages of Installation

The installation process for a commercial fire exit door in London typically begins with a thorough site survey and risk assessment. This involves an expert evaluating the building's layout, foot traffic, and potential fire risks to determine the correct type of door, hardware, and location. This stage is crucial for ensuring the installation meets both the building's needs and legal requirements. Following the survey, a detailed plan is created, outlining the door’s specifications, including its material (often steel for its durability) and the type of panic hardware to be fitted.

The physical installation involves a skilled team of technicians. They ensure that the door frame is securely fitted and that the door leaf is hung correctly to allow for free and unhindered opening. The most critical part of this stage is the fitting of the panic hardware. This could be a push bar or a push pad, which must be installed precisely to British Standards (BS EN 1125 for public areas or BS EN 179 for controlled environments) to guarantee that it operates instantly and reliably with minimal force. The final step is to test the door to ensure it functions perfectly, and to check that all external locking mechanisms can be overridden by the internal panic hardware at all times.

Compliance and Certification

The installation must comply with the Regulatory Reform (Fire Safety) Order 2005 and other relevant British Standards. In London, the local fire authority, the London Fire Brigade, has the power to inspect premises and demand changes if installations are not up to standard. Therefore, installers must be highly knowledgeable about these regulations. Upon completion, the installation should be certified, providing the client with documentation that proves the door has been fitted correctly and is compliant. This certification is essential for insurance purposes and for satisfying any future fire safety audits.

The Importance of Professionalism

Given the high stakes involved, choosing a professional and experienced installer is non-negotiable. They must have a proven track record of working in London, understanding the city’s unique challenges, from logistical issues like access to specific sites to navigating local planning and conservation requirements. A reputable installer will not only fit the door correctly but will also provide advice on ongoing maintenance, ensuring the door remains a dependable part of the building’s safety system for years to come.

fire-door-sign
fire-exit-sign
fire-door-revolver
fire-door-internal

Testimonials

Highly trained and very knowledgeable engineers, fast and efficient service

London Buisness School

Professional company to work with

ISS World

tall-building
window-front

Contact Us

This field is for validation purposes and should be left unchanged.